W Wrenchit Docs Open Console

Platform

Schedules, models and limits

A schedule decides when work runs. The model decides what does the thinking. Usage tells you what it cost. This page covers all three, and the limits you should plan around.

Schedules

A schedule runs a prompt in a fresh session, either once or on a repeat. It is the simplest way to make an agent do something later without keeping a chat open.

Open ai.wrenchit.net and choose Schedules, then New schedule. A schedule has four parts:

PartWhat to set
PromptThe instruction to run. Write it as if nobody will be there to clarify it, because nobody will.
ProjectThe project the session starts in. The agent sees that project's files and instructions.
WhenOnce at a chosen time, or every N minutes, hours or days.
NameA label for the list. Use the outcome, not the mechanism.

Repeat intervals

Repeats are fixed intervals: every N minutes, hours or days. There are no calendar rules such as “weekdays only”; pick the closest interval and have the prompt check the date if the work should only happen on some days.

What a run does

  1. The engine opens a new session for the prompt in the chosen project.
  2. The agent runs the prompt to completion and reports the result.
  3. The schedule records the run as Scheduled, Running, Done, Failed or Cancelled.
  4. The next run is set from the interval. A failed run does not stop later runs.

Cancel a schedule from its row in the list. Cancelling stops future runs; it does not delete sessions that already ran. Open a past run with Open session to see the transcript.

Schedules are for prompts, coils are for goals. A schedule runs one prompt and stops. A coil keeps a board, plans across runs and can ask you for approval. If the work needs to remember yesterday, use a coil with a schedule rather than a bare schedule.

Coil timing

A coil wakes on the trigger you set in its wizard. The coil list shows the next run and the last run, and marks a coil that has never run.

Each day the coil plans its day at 4 AM as a set of blocks, within quiet hours and a block budget. Reschedule today changes that day's plan without changing the standing brief. Use it when today is different, not when the job has changed.

Coil states

StateMeaning
AsleepIdle, waiting for the next trigger.
WakingStarting a run and loading its notes.
WorkingActively on a task.
GlancingChecking for due work rather than doing a full task.
Needs youWaiting on you. Open the ask and approve or deny it.
LearnedA run finished and wrote something worth keeping to memory.
StuckThe last run failed. Open the run to see why.
OffDisabled. It will not wake on its own.

Models

The model is chosen per session from the model picker. The list is not global: a workspace admin decides which models are enabled, so two accounts can see different choices. If a model you expect is missing, it is a workspace setting, not a client bug.

Model choice affects three things you will notice:

Switching models mid-project is allowed. The new model sees the conversation and the project files, not the previous model's private reasoning, so restate any constraint that only existed in your head.

Usage and limits

Wrenchit meters usage in credits. A workspace admin sets the dollar value of a credit and the per-model rates; the product converts tokens into credits and shows the result. The coil usage panel reports tokens, the plan and an estimated cost, and labels the cost as an estimate because rates and rounding can change.

These docs do not publish a rate card. Rates are set per workspace and can change without a client release, so the number that applies to you is the one in Console or on your agreement. Check there before you budget a long-running coil.

What counts

Limits you can plan around

Choosing a model

If the work is…Start with…
A rename, a copy edit, a single-file fixA fast model. Escalate only if it gets the change wrong twice.
A multi-file feature with testsA stronger model, and give it the test command up front.
Research across many sourcesA model with a large context window, plus a written note of what matters.
An always-on coilThe cheapest model that reliably passes the Judge. Measure a week before scaling the schedule.

“Reliably passes the Judge” is the real bar. A cheaper model that needs three retries usually costs more than the stronger one that finishes in one.